How BESS International moved its production floor from paper to Mantsu in three months

Mantsu

Customer story

As production volume doubled, BESS International's paper-based way of working began to show its limits. With Mantsu, the company started small and digitised one production line first. The project took three months and gave the team its first real-time view of orders and downtime.

2×

Production volume since 2023

3 months

From project start to delivery

40%

Of recorded downtime traced to short stops (first readings, summer 2026)

Modules in use at BESS

Order Cockpit

Operators open the running order on a screen at the line and move straight on to the next one. The production lead no longer prints orders.

Downtimes

Every stop on the line is recorded, with stops under ten minutes logged as short stops, so patterns become visible at machine level.

Lists

Start and end checklists for Standard Operating Procedures. No order can start before its food-safety checks are confirmed.

Production doubled, and BESS took a fresh look at every step

BESS International produces and packs cooking and frying oils in the port of Antwerp. It fills everything from one-litre bottles to twenty-five-litre jerrycans, and supplies industrial volumes in intermediate bulk containers (IBCs) and flexitanks. Private label is its main focus, next to its own house brand, and a large share of its volume leaves the port as container exports. A fixed team of around ten people runs the site, with up to fifteen on busy production days.

Since 2023, production volume has roughly doubled. To see what that growth meant for the organisation, BESS worked with an external partner to map its full process, from the first sale to the final payment, including who is responsible for each step. The exercise showed that some work was being done twice, and that a lot of responsibility rested with a few people. BESS decided to digitise its processes step by step, starting with the production floor.

Production ran on Excel, paper and a walk to the shop floor

BESS created its production orders in its ERP (enterprise resource planning) system and printed them out. The weekly production schedule lived in an Excel sheet that the team updated by hand. At the line, operators filled in paper forms, which were then scanned and re-entered into the ERP, with the scan saved on the network drive. Anyone who wanted to know how an order was doing had to walk onto the shop floor and look.

Many food producers will recognise this way of working. It served BESS well while volumes were lower. Jonathan Brits leads operations and IT at BESS. With twice the volume, he wanted to make production measurable and free up time for the team.

BESS looked for a first step that could go live fast

For a team of this size, a large, all-at-once manufacturing execution system (MES) project was not the obvious route. Jonathan, who has a background in IT and software, first explored what he could build himself. He then asked several suppliers for a proposal and compared them. He was looking for a platform that would work out of the box and could go live quickly.

“What mattered most to me was finding a party with real know-how, one that could guide me through the process. Then we get the standard procedures for how production normally runs, and we make the adjustments our own operation needs.”Jonathan Brits · Operations and IT, BESS International

Mantsu delivers those standard procedures as ready-made modules for order execution, downtime tracking and Standard Operating Procedures. BESS could start from modules shaped by real manufacturing projects and adapt them to its own lines.

Before deciding, Jonathan spoke with an existing Mantsu customer that runs production across several sites. That conversation answered his question about scale: the platform can grow with the company. A friend who works at a large IT company already knew the technology, which made it a foundation Jonathan trusted.

The standard modules took on BESS's own food-safety checks

Jonathan wanted the quality checks for each order built into the system itself.

“We work in food, so traceability is paramount. We have to know exactly which packaging goes into which production run and which oil goes into which bottle.”Jonathan Brits · Operations and IT, BESS International

BESS set up its checks in the Lists module. When an operator opens an order, a start checklist appears. The operator confirms the ingredients, packaging and labels, and that the machine is ready to run. Only then can the order start. At the end, a second checklist verifies the materials used, before the operator records material consumption and closes the order. The checks that used to be on paper are now built into every order, and no order can start without them.

Where BESS needed small additions to the product along the way, Mayker built them in as part of the project.

Mantsu went live in three months, one line at a time

The project ran from mid-March to mid-June 2026, and the first production orders went through Mantsu in early July. BESS started with one production line. For a while, the team ran the old and new way of working side by side on that line, until everyone was fully confident. With oil, packaging and labels to match on every order, BESS wanted proof on the shop floor first.

The team first worked with a single tablet on a flexible mount and tested it at different spots on the shop floor. In early September, fixed screens were installed at each line. Each step gave operators time to get used to Mantsu before the next one.

Operators work from the Order Cockpit, and the office sees every order

At the line, operators open the running order in the Order Cockpit on a screen. When an order is done, they move straight on to the next one, and the production lead no longer prints orders. For the people who plan and track production, the change is just as visible.

“We can see on our dashboard how many orders are running, whether there is downtime and whether we are on schedule. That is our biggest win at the moment.”Jonathan Brits · Operations and IT, BESS International

Checking on an order used to mean walking onto the shop floor. Today, anyone in the office can see its status at any time.

The first downtime data showed where the lines lose time

The Downtimes module records every stop on the line. Stops under ten minutes are logged as short stops. The first readings surprised Jonathan: forty percent of recorded downtime turned out to be short stops. One short stop is easy to miss. Forty percent gives the team a pattern to act on. As Jonathan puts it, when the same stop keeps coming back, it usually points to an issue with the machine.

BESS's lead technician has since asked for a full logbook of downtime reasons, organised as a tree of causes, so the team can see issues coming at machine level. The request came from the technical team itself: the shop floor is now asking for more data.

BESS is planning its next steps on Mantsu

Jonathan sees the production floor as the start of a broader digitisation plan for the company.

“I see this as a first real step in a long process I have in mind, to keep organising and digitising the business.”Jonathan Brits · Operations and IT, BESS International

Next on the list is extending planning in Mantsu from day-to-day scheduling to the longer term. In time, BESS also wants to link Mantsu to the tool it uses to coordinate container loading with its on-site partner.